Hot Galvanized Steel Cattel Circular 1100m3 Water Tanks Making Machine for Sale

Intrduction of Business:

Our firm can offer comprehensive generation traces and machines according to your requirement. We offer numerous distinct sizes of Storage silo panel device with our auxiliary equipment. We have received a excellent evaluation from customers since of superior technology, excellent high quality and right after-sale support.

 

Equipment Information:

Decoiler / Uncoiler:

Coil Width : Max. 1500mm

I.D : 510-610mm

O.D: Max. 1300mm

Capability: Max. 10 Tons

Decoiler type: Manual / CZPT/Computerized

 

Feeding & Leveling:

Pinch feeding: 3 Units ( six Rollers )

Leveling : 7 Rollers ( Higher 3 Rollers, Base four Rollers )

 

Punching system:

Punching motion: CZPT Punching, Submit-punching

Punching dies: Cr12 Mov Metal, HRC58-sixty two

Punching station: 1-two Unites ( depend on gap styles )

Punching in longitude managed by PLC, punching at horizontal altered by manual hand wheel.

 

Reducing unit:

Reducing movement: CZPT Chopping, submit-Reducing ( cutting sheet after forming )

Cutting blades: Cr12Mov with heat treatment HRC58-62

Duration Measuring: Automatic duration measuring by encoder & PLC.

Slicing Tolerance: +/-one.5mm(for each 3m)

 

Roll Forming Machine:

Forming Stations: 17 Stations

Rectifying: 1 unit

Roller materials: GCr15 steel, heat treatment

Diameter of shaft: 100mm

Shaft materials: High grade 45# steel

Push kind: Equipment-box

Forming speed: 0-15m/min

Main electricity: 22KW(11kw*2)

Servo motor: 2 Units

 

CZPTal handle :

PLC: PANASONIC Brand or CZPT-produced

Inverter: YASKAWA Model or CZPT-manufactured

Contact monitor: MCGS Brand name or CZPT-made

Procedure sort: Touch monitor & Button

 

CZPT Station:

CZPT station: Famous Chinese model

CZPT electricity: 30KW

 

Runout Table :

Desk sort: Simple non-power kind

Purpose: To support the concluded panels

Device Overview:

 

Machine Loading:

 
CZPTer Browsing:
 
1. 

 

Payment phrases and following-sale provider:

1) FOB ZheJiang
two) Payment: 30% T/T deposit, and pay the harmony just before shipping and delivery.
three) Shipping and delivery time: sixty doing work times.
four) Guarantee interval: twelve months limited guarantee starting from date of shipping and delivery. Transport value for areas to be replaced throughout warranty period have to be borne by the client.
5) CZPT areas: bearings, buttons, chains, magnetic valve, protecting tube etc.
6) Set up and training:
one. If buyers go to our manufacturing facility and check out the device, we will educate you how to set up and us the device, and also prepare your workers/technician face to face.
2. With out browsing, we will ship you person handbook and CD to teach you to install and run.
3. Price OF Installation:
The purchaser must pay out the installation expenses (USD 100 one guy one day). To the seller’s appointed account by T/T ahead of the seller’s professionals go to the buyer’s factory. The consumer pays the seller’s experts journey expense outdoors China, which includes round air tickets price, lodging and foodstuff, offer transportation from dwelling hotel to the work area, essential conversation, and insurance, etc.

Hot Galvanized Steel Cattel Circular 1100m3 Water Tanks Making Machine for Sale